Skip to content

Roofing Permits in East Grand Rapids

Last reviewed: August 5, 2026

Yes. The City of East Grand Rapids lists roofing among projects that require a building permit. Applications go through the city’s process and are then reviewed for building-code compliance by Cascade Township Building Inspections. Confirm the current forms, fees and inspection steps before work starts.

Who applies?

The city states that a homeowner may apply when the homeowner will perform the work. Otherwise, a licensed contractor or builder must obtain the permit and complete the work. The current East Grand Rapids building application also says roofing and siding submissions require the Cascade Township worksheet.

Where the application goes

  1. Use the City of East Grand Rapids online permit portal or request the current paper application.
  2. The city performs zoning and drainage review where applicable.
  3. The application is forwarded to Cascade Township Building Inspections for code review and inspections.
  4. Building permit fees are paid to Cascade Township; other city requirements may apply depending on project scope.

A typical roof-covering replacement is different from an addition that changes the structure or impervious area. If the project changes roof shape, adds a structure, affects drainage, uses a temporary dumpster, or involves the right of way, ask the city which additional reviews apply.

Official contacts and forms

Last reviewed July 20, 2026. Permit procedures and fees can change. Roof EGR summarizes the official pages but does not issue permits or determine code compliance.

Before accepting a quote

Ask who will pull the permit, which fees are included, and which inspections the contractor expects. See the full quote-adjustment checklist.